summaryrefslogtreecommitdiff
path: root/t/t0500-progress-display.sh
AgeCommit message (Collapse)Author
2020-05-12trace2: log progress time and throughputEmily Shaffer
Rather than teaching only one operation, like 'git fetch', how to write down throughput to traces, we can learn about a wide range of user operations that may seem slow by adding tooling to the progress library itself. Operations which display progress are likely to be slow-running and the kind of thing we want to monitor for performance anyways. By showing object counts and data transfer size, we should be able to make some derived measurements to ensure operations are scaling the way we expect. Signed-off-by: Emily Shaffer <emilyshaffer@google.com> Signed-off-by: Junio C Hamano <gitster@pobox.com>
2019-11-10Fix spelling errors in comments of testcasesElijah Newren
Reported-by: Jens Schleusener <Jens.Schleusener@fossies.org> Signed-off-by: Elijah Newren <newren@gmail.com> Signed-off-by: Junio C Hamano <gitster@pobox.com>
2019-09-17Test the progress displaySZEDER Gábor
'progress.c' has seen a few fixes recently [1], and, unfortunately, some of those fixes required further fixes [2]. It seems it's time to have a few tests focusing on the subtleties of the progress display. Add the 'test-tool progress' subcommand to help testing the progress display, reading instructions from standard input and turning them into calls to the display_progress() and display_throughput() functions with the given parameters. The progress display is, however, critically dependent on timing, because it's only updated once every second or, if the toal is known in advance, every 1%, and there is the throughput rate as well. These make the progress display far too undeterministic for testing as-is. To address this, add a few testing-specific variables and functions to 'progress.c', allowing the the new test helper to: - Disable the triggered-every-second SIGALRM and set the 'progress_update' flag explicitly based in the input instructions. This way the progress line will be updated deterministically when the test wants it to be updated. - Specify the time elapsed since start_progress() to make the throughput rate calculations deterministic. Add the new test script 't0500-progress-display.sh' to check a few simple cases with and without throughput, and that a shorter progress line properly covers up the previously displayed line in different situations. [1] See commits 545dc345eb (progress: break too long progress bar lines, 2019-04-12) and 9f1fd84e15 (progress: clear previous progress update dynamically, 2019-04-12). [2] 1aed1a5f25 (progress: avoid empty line when breaking the progress line, 2019-05-19) Signed-off-by: SZEDER Gábor <szeder.dev@gmail.com> Signed-off-by: Junio C Hamano <gitster@pobox.com>